另一段关于上海地铁的句子,高分求翻译!
另一段关于上海地铁的句子,高分求翻译!?
相关回答 (3)
排序方式:

张小酷
2025-12-11 10:33:03
The priority of the ventilation air-condition system of Shanghai subway 7th line project is put temperature, humidity, air flow, smoke evacuation on emergency of station public areas under fully control, ensuring the comfortable temperature and ventilation of every station's waiting room. Meanwhile, all the inverter air conditioners should have conflagration mode, which enables cts fully run with ignoring outer control signals when accident happens, so to provide essential fresh air for passengers and firemen and ensure the safe evacuation of passengers, and with function of smoke evacuation.